top of page

The Critical Path: Why Return to Play Protocols Matter in Sports Rehabilitation

Writer: Joseph Caligiuri
Joseph Caligiuri
Nov 14, 2024
4 min read

Updated: Nov 17

Soccer player injured on field needing return to play therapy

In high school, college, and professional sports, the pressure to return athletes to competition quickly after injury can be immense. However, rushing this process often leads to reinjury and longer recovery times. Recent research has revealed that a structured, evidence-based approach to rehabilitation – one that distinguishes between "return to training" (RTT) and "return to play" (RTP) – is crucial for optimal recovery and performance.


The Hidden Injury Risk: Poor Aerobic Fitness


One of the most overlooked factors in injury prevention is aerobic fitness. Research has consistently shown a strong correlation between low aerobic fitness and increased risk of injury. This relationship becomes particularly crucial during the rehabilitation process, where extended periods of reduced activity can significantly affect an athlete's cardiovascular capacity.


Studies indicate that just 20 days (about 3 weeks) of reduced aerobic activity can result in a marked decrease in VO2max, the gold standard measure of aerobic fitness. This decline in cardiovascular fitness does not just affect performance – it creates a perfect storm for reinjury when athletes return to competition too quickly.


The Two-Step Return: Why It Matters


1.      The path back to competitive sports isn't a single leap – it's a carefully orchestrated progression. Modern sports medicine now recognizes two distinct phases:

2.      Return to Training (RTT): A phase where athletes are allowed to begin strength training out of the traditional physical therapy setting, often with specific restrictions and modifications.

3.      Return to Play (RTP): The final phase where athletes are partially reintegrated into team activities, often with specific restrictions and modifications

 

This distinction isn't just semantic – it's fundamental to successful rehabilitation. RTT decisions are based on clinical-functional criteria, while RTP decisions incorporate more complex functional-performance metrics.


Building a Comprehensive Lower Body Return Protocol


Phase 1: Return to Training Focus


Unilateral Strength Testing

  • Single leg endurance squats with proper form and control

  • Single leg deficit step-up assessments comparing injured vs. uninjured side

  • Single leg deadlifts to assess hip stability and strength

  • Single leg landing mechanics to evaluate deceleration strength

  • Side lying Copenhagen bridges for core and adductor strength

  • Single leg endurance broad jumps for power and decelerative control


Strength symmetry between the injured and uninjured sides should reach at least 95% before progressing to more dynamic activities. This testing is not just about raw strength – it is about identifying and addressing movement compensations that could lead to reinjury.


Field Tests

When assessing an athlete's readiness to return to sport, medical professionals must evaluate the "tolerable risk" – the highest acceptable level of risk for various potential outcomes. This comprehensive assessment includes:


Medical Factors:

  • Nature of injury (acute vs chronic)

  • Injury history (initial occurrence vs recurrence)

  • Severity and specific anatomical site affected

  • Individual athlete characteristics:

    • Biological factors

    • Endocrine and metabolic conditions

    • Gender-specific considerations


Performance Testing:

  • Sport-specific movement analysis

  • Agility evaluation

  • Acceleration and deceleration capacity

  • Directional change ability

  • Speed and endurance levels


This structured approach helps ensure a safer, more objective return-to-play decision.


Phase 2: Return to Play Focus


Sophisticated Volume Monitoring

  • Quantitative evaluation of movement speeds and distances

  • Qualitative assessment of metabolic power and performance

  • Analysis of key performance parameters

  • Monitoring of acute versus chronic workload ratios


Modern technology, particularly GPS tracking, has revolutionized this phase by providing objective data on an athlete's readiness to return to competition. If available, these systems can compare pre-injury performance metrics with current capabilities, ensuring athletes have truly returned to their baseline level of function. If not available, we can use documented performance data to establish optimal performance measurements.


The Role of Aerobic Reconditioning

When an athlete has been sidelined for more than 20 days (about 3 weeks), special attention must be paid to aerobic reconditioning. Research suggests that athletes should re-establish at least 90% of their pre-injury VO2max before receiving full clearance to return to competition. This requirement helps ensure that:

1.      Athletes have the endurance to maintain proper form throughout competition

2.      Fatigue-related injury risks are minimized

3.      Performance capabilities match competitive demands


Psychological Readiness: The Often-Overlooked Component

While physical parameters are crucial, psychological readiness plays an equally significant role in successful return to play. Fear, anxiety, and apprehension can not only interfere with performance but also increase the risk of reinjury. A comprehensive return protocol must address:

  • Athletic confidence

  • Fear of reinjury

  • Competition readiness

  • Mental fatigue management


The Bottom Line: A Scientific Approach to Return


The days of making return-to-play decisions based solely on experience or intuition are over. Modern sports medicine demands an evidence-based approach that:

  • Carefully assesses aerobic fitness levels

  • Implements a structured RTT phase before RTP

  • Uses objective measurements to track progress

  • Emphasizes unilateral strength and movement quality

  • Considers both physical and psychological readiness

  • Monitors workload to prevent reinjury


This comprehensive approach might take a greater time commitment than traditional methods, but the reduced risk of reinjury and improved long-term outcomes make it well worth the investment. For athletes and sports professionals, understanding and respecting this process is crucial for sustainable performance and career longevity.


By implementing these evidence-based protocols, we can better serve our athletes and help ensure their safe and successful return to competition. After all, the goal isn't just to get back in the game – it's to stay there.

 
 
 

Comments


bottom of page